Please see our video for Volcano Burner machine.

A BURNER MACHINE WITH NO SMOKE, NO EFFLUENT & NO EMISSION

volcano burner has two(2) types of machines

We have Volcano Burner V-70 & V-150

A) Volcano Burner V-70

  • 70 kg / hr
  • 2-3 Tonnes / day
  • Can run up to 24hrs. a day
  • Size: 2.7m x 1.0m x 2.3m
  • Electric usage is: 2.3kW / hr (Single Phase)
  • Combustion Temperature 800-1000 ℃

B) Volcano Burner V-150

  • 150 kg / hr
  • 4-5 Tonnes / day
  • Can run up to 24hrs. a day
  • Size: 3.8m x 1.2m x 2.4m
  • Electric usage: 3.0kW / hr (Single Phase)
  • Combustion Temperature 800-1100 ℃

VOLCANO SPECIFICATION COMPARISON

LET SEE SOME OF OUR ACTIVITY

Our machine was done a pilot project at Tuaran city.

ZERO WASTE PILOT PROJECT RESULTS REPORT
DATE: 23/11/2017 – 25/12/2017
PLACE: TUARAN CITY

Rising of population, residential areas and increasing amount of waste from the expansion of cities, and the enormous budget and environmental problems are one of the problems that we are facing now. So, this zero waste project containing Volcano Burner machine is being addressed to solve these problems.

To solve these problems, we have been running a zero waste disposal system in Tuaran City for a month and we would like to give you the results based on our report.

This is the current situation and environment at Tuaran city before the machine arrived.

All solid waste separated, and below is the list of garbage collections that are separated before put into Volcano Burner.

  1. Aluminum cans
  2. iron
  3. compressed gas cans
  4. bottles
  5. paper
  6. diapers
  7. food waste
  8. other industrial waste

Picture below shows the ash collection after burning process. Only 2% from the original waste.

We can see before and after the machine do their job. We can see the place is clean and clear without wastes.

  1. We receive feedback saying that the burning is smoldering without smoke and the process is odorless
  2. Residents are very satisfied and happy with the pilot project  that are being conducted at their area and expecting us to continue the project to achieve(zero waste)
  3. Residents give us feedback saying that the garbage dumb area is very clean and tidy now

VOLCANO BURNER TESTING REPORT